Krick RoMarin FLB 1 Mode D'emploi page 60

Masquer les pouces Voir aussi pour RoMarin FLB 1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Place the superstructure on the hull. Sand the cover box flat to rest on the foredeck. Adjust the transition to the
superstructure accordingly. Tape the deck in the area of the protective box and the deck edges with adhesive
tape so that no glue runs onto the deck or the deck edges. Glue the protective box to the superstructure with
super glue. Remove the superstructure and re-glue the protective box from the inside.
4.4
Fig.: Superstructure, cover box, doors and roof
Companionway, funnels and funnel ends
No.
Description
4.8
Stair side panel
4.9
Step
4.10
Companionway
4.11
Companionway
4.12
Funnel base
4.13
Side wall inside
4.14
Side wall outside
4.15
Longitudinal wall front
4.16
Longitudinal wall, rear right
4.17
Longitudinal wall, rear left
4.18
Funnel end top
4.19
Funnel end
4.20
Funnel end fitting piece
4.21
Support light mast
4.22
Template
4.23
Bluelight base
Fig.: Superstructure staircase and companionway
Status 25. August 2022
4.3
4.2
Dimensions
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1.5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
Laser part
Laserpl. 1,5
18
4.1
Qty.
2
1
1
1
2
2
2
2
1
1
4
12
1
2
1
2
4.10
4.11
4.9
4.8
© Krick Modelltechnik

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ro1091

Table des Matières