Installing the unit
6. Installing the unit
Before installing the unit, the packaging must be removed, taking special care not to damage the housing (see
section "4.2. Unpacking").
Check that there is no condensation inside the packaging. If there are signs of condensation, the unit must not be
installed until you are sure it is completely dry.
CAUTION
All installation operations must comply with current regulations.
All operations involving moving heavy weights must be carried out using the required mechanical means (crane,
hoist, etc.).
6.1. General requirements for installation
•
The environment of the unit must be appropriate and meet the guidelines described in chapter "5.
Preparation for installing the unit". Additionally, the parts used in the rest of the installation must be
compatible with the unit and comply with the applicable legislation.
•
The ventilation and workspace must be suitable for maintenance tasks according to the applicable
regulations in force.
•
The external connection devices, which must be suitable and sufficiently close as set forth in current
regulations.
•
The feed cables must be of the appropriate gage for the maximum current.
•
Special care must be taken to ensure that there are no external elements near the air inlets and outlets
that obstruct proper cooling of the unit (see section "5.1. Environment").
6.2. INGEREV FUSION Street
Follow the instructions below to install the INGEREV FUSION Street:
1.
Place the anchor on the ground, respecting the following dimensions.
Front of the station
2.
Open the station's side locks to access the interior. The top lock is activated with a key.
3.
Insert the cabling through the lower cable glands, leaving a certain amount of slack so that the cabling
is not tight after connecting (see sections "2.7. Cabling accesses" and "8.3. Power supply connection
process").
ABW2011IQM01_D - Installation and Operation Manual
35
150
=
=
Back of the station
265
M12
Ingeteam
EN
ES
FR
IT
PT
23