Preparation for installing the unit
It should be borne in mind that moderate condensation may occasionally occur as a consequence of temperature
variations. For this reason, apart from the unit's own protection, it is necessary to monitor these charging stations
once they have been started up on sites where the conditions described above are not expected to be present.
In the event of condensation, never apply voltage to the unit.
5.3. Supporting Surface and Fastening
INGEREV FUSION Street
INGEREV FUSION Street units must be attached to an even and solid surface, and must be placed in a perfectly
vertical position.
To calculate the minimum concrete pad, take into account the following details.
•
Minimum distance from the anchor bolts to the edges of the concrete pad: 100 mm.
ABW2011IQM01_D - Installation and Operation Manual
0 0
> 1
0 0
> 1
5 0
> 3
Ingeteam
EN
ES
FR
IT
PT
21