All manuals and user guides at all-guides.com
EN
3. ASSEMBLY
3.1 UNPACKING
Open all cartons taking care not to damage the contents.
After having removed the package, check the completeness and integrity of the materials.
In the case of damage attributable to transport, it is necessary for this to be reported to the transporter within the
legal terms in order to avoid losing the right to compensation provided by the insurance company.
3.2 INSTALLATION
- The steam generator must be installed and positioned in a suitable technical compartment that can be
opened by means of the tool or utility room accessible using a key.
- The steam generator must be installed in a dry area, which not exceeding the temperature of 40°C.
WALL INSTALLATION
The appliance is hung by fixing brackets supplied to be applied to the generator body. Different types of walls require
different types of fixing. Use the most suitable according to the type of wall present. The inlet and outlet of the
electrical wiring and water are located in the left side of the steam generator. Identical for all power supply versions.
Aeration is guaranteed by ports located on the back and on the bottom of the steam generator.
INSTALLATION ON SUPPORTING CLOSED AND PARTIALLY CLOSED COMPARTMENT
Assembly on supporting surface. It is necessary to respect the minimum measures of the compartment which must
be equal to or larger than 100mm distance between the steam generator and the bottom of the compartment and
between the steam generator and the internal sides of the compartment. The inlet and outlet of the electrical wiring
and water are located in the left side of the steam generator.
Identical for all power supply versions. Aeration is guaranteed by ports located on the back and on the bottom of the
steam generator.
13
NUVOLA SMART POWER 110-140-180