Breville the Big Squeeze BJS700 Mode D'emploi page 294

Table des Matières

Publicité

ASSEMBLY
1. Assemble the strainer into the
rotation wiper then place this
assembly into the juicing bowl
ensuring the dot
strainer is aligned with the dot on the
juicing bowl.
2. Place the juicing screw into the strainer.
Turn and press down on it until it clicks into
place.
The juicing screw needs to be locked
in place in order to close the drum lid.
29
3. Place the drum lid on to the juicing bowl
aligning the dot
dot
to close, aligning the dot on the drum lid
with the LOCK mark .
on the
.
on the drum lid with the
on the juicing bowl. Turn clockwise

Publicité

Table des Matières
loading

Table des Matières