Connection
➤
Connect the positive terminal of the starter battery to relay connection 30 (Batt. 1)
and the positive terminal of the additional battery to relay connection 87 (Batt. 2).
Note
Use cables with the correct cable cross section – see circuit diagrams, pages
3 to 8.
➤
Insert an electrical fuse in direct proximity to the starter battery and an electrical fuse
in direct proximity to the supply battery into the positive lead.
– PerfectPower PP1000 inverter (DC kit 1): 150 A
– ECW-012VS inverter (DC kit 2): 250 A
– SinePower SP1500 inverter (DC kit 3): 200 A
Note
The fuse in the positive lead from the charging current distributor to the
battery can only be omitted if the lead is very short and will not come into
contact with metal.
Note
To connect the inverters in the scope of delivery of the DC kits, please refer to
the documentation accompanying the equipment.
DC kit 1 and DC kit 2:
➤
Join the 230-V connector of the air conditioner to the PerfectPower PP1000 /
ECW-012VS inverter.
DC kit 3:
➤
Join the 230-V connector of the air conditioner to the connector provided on the
VS-230-2 priority circuit and, in turn, connect this to the SinePower SP1500 inverter
(item no. MSK1500-012).
Note
The remote controls for switching the inverters on and off must be connected
in accordance with the enclosed instructions and the relevant circuit diagram
(see pages 3 to 8).
7.1
DC kit 1 with Dometic CA1000
Circuit diagram, see page 3
Roof air conditioner: Dometic CA1000
Charging current distributor: ECL-75
Inverter: PerfectPower PP1000 (item no. 8100-12VS)
➤
Install inverter remote control C (membrane button) in an easily-accessible place and
connect its cable to the inverter.
Note
Observe also the instructions in the scope of delivery of the sensing cable.
➤
Remove the CA1000's outlet panel.