Figure 3-2. Removing Battery Cables
6. Remove the controller sheet metal cover and fasteners. See Fig-
ure 3-3.
Figure 3-3. Removing Controller Fascia
7. Attach and use the provided template to position the hole loca-
tion. Mounting hole location is critical for proper operation. 1" of
the Mobile Link unit antenna must be above the top of the gener-
ator roof when installation is completed.
NOTE: 2013 and later models have a prepositioned dimple to mark
the center of the hole.
14
Mobile Link