Mechanical installation
Mounting steps
5.5
Mounting steps
(
Stop!
Heavy device weight
The device is very heavy and must be lifted for the mounting.
Possible consequences:
ƒ
ƒ
Protective measures:
ƒ
ƒ
ƒ
Proceed as follows for the installation:
1. Prepare M5 threaded holes on the mounting plate, for instance according to the
mounting grid.
– Always use all mounting points specified.
2. Screw the filter onto the mounting plate.
– Use M5 screw and washer assemblies or M5 hexagon socket screws with washers.
– If further devices are to be mounted directly adjacent on the right−hand side of the
filter, do not tighten the screws fully before all devices are mounted and aligned.
– Tightening torque: 3.4 Nm (30 lb−in).
44
Injury to persons, particularly backache when lifting and holding the device,
respectively
Injury to persons and damage to material assets due to the device falling
down
The device must only be carried with a load bearing system such as an
indoor crane permitted for the device weight
Before the transport, the hoist, the load bearing system and lifting
accessories must be checked for sufficient payload and faultless status
Do not remove the hoist and the lifting accessories until the device lies safe
on a stable surface or is finally mounted.