Cobra SPYBALL 6808-9 Notice De Pose page 15

Masquer les pouces Voir aussi pour SPYBALL 6808-9:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WHITE/GREEN
wires
N. 12
RED and BROWN
wires with a 2-
way connector
WHITE/RED wire
N. 13
BLACK wire
Antenna
Engine immobilisation application diagram (B)
SPYBALL 6808-9/6828-9 ENGLISH
Second ignition immobilisation circuit. Cut the positive
cable that powers the starter solenoid. Connect one
end to one of the wires , the other end to the other wire.
During the cranking phase, measure the value of
the electrical current in the circuit that has been
cut, to make sure that it does not exceed the
technical specifications of the product.
Install an additional relay if necessary.
6808 – 6809 = DO NOT USE;
Connect to the pre-wired LED that comes with the
alarm fitting accessories;
This wire supplies a trigger control during the alarm
phase. It allows for the connection of e.g. BikerSat;
Do NOT cut or ground the antenna wire!
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Spyball 6828-9

Table des Matières