Inspection And Maintenance - Morningstar EcoPulse EC-10 Manuel De L'utilisateur

Masquer les pouces Voir aussi pour EcoPulse EC-10:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.5 Inspection and Maintenance

Table 4.3 below lists the recommended maintenance
schedule to keep your EcoPulse performing optimally.
Schedule
2 weeks after installation
3 months after installation
Monthly, or After Each
Equalization
Table 4.3. Maintenance Schedule (Cont.)
26
Operation
Maintenance Items
Re-tighten power terminal
connections to specified
torque values.
Re-tighten power terminal
connections to specified
torque values.
Inspect the battery bank.
Look for cracked or bulging
cases, and corroded
terminals.
For wet cell -flooded type
batteries, make sure the
water level is correct. Wet
cell water levels should be
check monthly according to
the manufacturer's
recommendations.
Schedule
Inspect the battery bank.
Look for cracked or bulging
cases, and corroded
terminals.
For wet cell (flooded
Monthly, or After Each
type) batteries, make
Equalization
sure the water level is
correct. Wet cell water
levels should be checked
monthly or according to the
manufacturer's
recommendations.
Clean the heatsink fins with
a clean, dry rag.
Inspect all wiring for
damage or fraying.
Inspect for nesting insects.
Re-tighten all wiring
Annually
terminal connections to
specified torque values.
Inspect the system
earth grounding for all
components. Verify all
grounding conductors are
appropriately secured to
earth ground.
Table 4.3. Maintenance Schedule (End)
EcoPulse Operator's Manual
Maintenance Items
27

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ecopulse ec-10mEcopulse ec-20Ecopulse ec-20mEcopulse ec-30Ecopulse ec-30m

Table des Matières