Electric connection with the boiler
GMR 1000 Condens
Tilt the flap on the control panel.
Open the protective hood.
Connect 2 wire of the remote control on the connector joint. The wires can be interchanged.
Engage the connector on the 2 pins marked S.AMB.
The remote control/boiler liaison cable must be separated
by at least 10 cm from cables carrying 230 V.
3
19/07/07 - 300010276-001-A
RS 100