INSTALLATION
Installation
8.1.2 ESH 5 O-N Trend - oversink installation
Material losses
!
The ESH 5 O-N Trend is designed exclusively for oversink
installation. The water connections of the appliance point
downwards.
Material losses
!
Connecting hose length (from tap to appliance) may not
exceed 1 m.
For connecting hoses > 1 m:
f Install a tube aerator attachment in the overflow
f
line.
9.
Installation
9.1
Appliance installation
f Mark out the holes to be drilled on the wall (see chapter "In-
f
stallation / Specification / Dimensions and connections").
f Drill the holes and insert suitable rawl plugs.
f
f Secure the wall mounting bracket using suitable screws.
f
f Hang the appliance on the wall mounting bracket.
f
9.2
Water connection
Material losses
!
Carry out all water connection and installation work in
accordance with regulations.
Material losses
!
The appliance may develop a leak and cease functioning.
f Never subject the appliance to water pressure.
f
f Never interchange the water connections.
f
f Set the flow rate (see tap instructions). Observe the
f
maximum permissible flow rate with a fully opened
tap (see chapter "Installation / Specification / Data
table").
16
| ESH 5 U-N Trend | ESH 5 O-N Trend
Material losses
!
When tightening the fittings, counterhold with a suitable
spanner.
ESH 5 U-N Trend
Match up the colour coding on the tap water connections and the
appliance:
- R.h. side blue = "Cold water inlet"
- L.h. side red = "DHW outlet"
f Secure the water connections from the tap to the appliance.
f
Note
Ensure that the water connections are not kinked during
installation. Prevent any tensioning during installation.
ESH 5 O-N Trend
24
f Secure the water connections from the tap to the appliance.
f
www.stiebel-eltron.com