Télécharger Imprimer la page

CIAT COADIS LINE 600 Manuel D'instructions page 33

Masquer les pouces Voir aussi pour COADIS LINE 600:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
1. UNPACKING THE UNIT, CHECKING AND STORING
Thank you for purchasing a CIAT unit. We trust that this unit will give you complete
satisfaction.
To ensure correct operation, all connections (electrical, hydraulic, etc.) must be made
in accordance with industry practice and the regulations in force in the country of use.
Your unit must be maintained as recommended in this manual.
The unit is delivered in two separate packages.
- An air handling box,
- A return/discharge panel,
With a label on the packaging giving all its specifications to allow you to identify it.
(type, model, etc.)
Each unit bears a data plate. Include the reference number shown on the data plate
in all correspondence.
It is the recipient's duty to inspect the contents of the packages upon receipt:
• I n the event of missing items, the customer must provide the exact number of
parcels delivered.
• I f any damage is found upon delivery, report it on the delivery receipt in the
presence of the delivery driver before the delivery note is signed.
IMPORTANT: In accordance with Article 133 of the French Code of Commerce,
these claims must be reported to the carrier by registered letter within three
business days of receipt. The terms "conditional" and "pending unwrapping" shall
have no value. The client must unwrap the goods in the presence of the driver.
Claims must be made at the time of delivery and be described in detail.
2. HANDLING
For your safety, wear protective gloves!
Important: the unit must be handled with care and preferably laid flat. Impacts may
cause damage to the frame or the body of the unit and adversely affect its main
functions and its appearance.
The unit should preferably be lifted using the brackets. It is possible to carry out the
installation using a fork-lift truck, as long as care is taken not to damage the unit.
The unit is placed inside the suspended ceiling. The unit must be fixed to the ceiling
using the 4 threaded rods (not supplied) on the 4 support brackets.
3. DESCRIPTION OF THE UNIT (Fig. 1)
a - Heat exchange coil
b - Fan motor assembly
c - Electrics box
d - Main condensate drain pan
e - Auxiliary condensate drain pan
f - Condensate drain
g - Support brackets
h - Air filter
j - Air return/discharge panel
k - Fresh air inlet
EN - 1
EN

Publicité

loading