Connection Of The Solenoid Valve; Product Closure; Washer Installation (Nxptz Range) - Videotec WASNX Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 32

6.2.3 Connection of the solenoid valve

Pass the power supply cable through the sealing ring.
Fig. 18
Connect the power supply cable to the connector as
described below.
Unscrew the screw and remove the connector.
Fig. 19
Remove the terminal block from the connector hood.
Fig. 20
Unscrew and remove the cable gland. Insert the
power supply cable and connect it to the terminal
block.
Re-insert the terminal block in the connector and
tighten the cable gland. Connect the connector to
the solenoid valve and screw in the screw.
Use cables with the characteristics outlined
below.
• Diameter: from 6mm (0.24in) up to 8mm
(0.3in).
• Section (single conductor): 1.5mm²
(15AWG) max.
10

6.3 Product closure

After installation and wiring, close the product.
6.4 Washer installation (NXPTZ
range)
Fasten the support (01) onto the PTZ unit body with
the metal clip (02) provided.
02
Fig. 21
Shorten the semi-rigid washer pipe (01) as needed.
Unscrew the nut (02) from the joint and slide it along
the pipe. Insert the end of the pipe into the ogive
(03).
01
Fig. 22
Lock the nut to the coupling.
Fig. 23
Tighten the delivery joint.
Fig. 24
01
03
02
MNVCWASNX_2222_EN

Publicité

Table des Matières
loading

Table des Matières