6.2
Installing the toilet with through-the-wall connections
20
➤ Use the floor template to locate the
vertical centerline of each hole .
➤ Place the toilet in the desired position and
mark the horizontal centerlines .
➤ Drill the hole sizes according to the template .
6.3
Installing a toilet and bidet combination
22
Mounting
Template
➤ Place the floor-mounting template in
the desired location . Keep at least 11"
between the centerline of the template
and any walls or interior fixtures .
➤ Punch through the center of the holes and
mounting bracket corners in the template .
➤ Cut out the oblong access hole as marked
on the floor template .
13
21
Template
4-Wire Control
Module Cable
➤ Route the wiring and plumbing through
the drilled holes .
I
➤ Proceed to "6 .5 Finalizing the installation"
on page 14 .
23
Hot-Water Line
➤ Secure the floor brackets to the floor using
the long hex-head screws from the toilet
floor-bracket kit .
➤ Tighten with a 3/8" socket wrench, using
the corner marks as guides .
I
➤ Route the cold-water supply line to the
toilet/bidet mixer-valve water line (blue
band) .
➤ Route the hot-water supply line to the
bidet faucet hot-water line (red band) .
Refer to "5 .2 Wiring/electronic
control module connections" on
page 8 .
Cold-Water Line
Do not completely tighten the hex-
head screws to the floor . Brackets will
tighten when fastening the toilet to
the brackets .
Toilets
EN