ENGLISH
8. COMMISSIONING
NOTE: The unit may only be commissioned if the applicable local regulations
and requirements (e. g. VDE specifications) and all connection specifications
have been fulfilled.
CAUTION! Risk of damage!
The transport securing mechanism blocks the function of the floater. There is a
risk of the unit overflowing. Before commissioning the condensate lifting unit,
the transport securing mechanism (Fig. 1, item 9) must be removed in order to
ensure that the unit functions properly. Pull out the two plastic clips on the left
and right hand sides of the device to remove them. When pulling out the trans-
port securing mechanism, hold the device steady with your other hand.
8.1
Functional check
• Plug in the mains plug.
• Fill the unit with clean water and check that the pumping sequence starts when the
water reaches the cut-in level (Fig. 2, item B).
• Check that the pumping sequence stops as soon as the water level reaches the cut-
off level (Fig. 2, item A).
To check the unit's alarm function, fill it with clean water until the water level reaches the
alarm level (Fig. 2, item C) and the alarm switch is triggered.
NOTE: In order to avoid increased running noise and protect the unit, there
must be no dirt in the condensate lifting unit.
9. MAINTENANCE
Have maintenance and repair work carried out by qualified specialist personnel only!
DANGER! Risk of fatal injury!
There is risk of fatal injury due to electric shocks when working on electrical
equipment. The device should be electrically isolated and secured against
unauthorised switch-on before any maintenance or repair work. Damage to
the connection cables should always be rectified by a qualified electrician
only.
NOTE: For safety reasons, it is not possible to disassemble the motor unit of the
condensate lifting unit.
28