Denver E Quick Rider X7 Mode D'emploi Et D'entretien page 7

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.1.2 Charge overnight, prior to riding the next day;
3.1.3 Apply chain oil periodically and clean if dirty or gummed up, using degreaser, then wipe clean and oil
bicycle chain again.
4. Battery installation & usage.
The electric bikes have the battery positioned onto the frame down tube (the battery pack is directly
connected to the controller box which is under battery bottom.
1. Put the controller to the bottom of down tube, and assure the cable of the controller and the other
cables like motor, display...connection well, then push it inside, as following: (Fig 2.0 ~ 2.2)
2. Put the plastic bracket to cover the controller, and then use the screws to lock it tightly. (Fig 2.3 ~2.5)
(Fig.2.2)
(Fig.2.0)
(Fig.2.1)
(Fig. 2.4)
(Fig. 2.3)
(Fig. 2.5)
3. Assemble the lock and battery discharge bracket, and then use the screws to lock it tightly. (Fig 2.6
~3.0)
(Fig 2.6)
(Fig 2.8)
(Fig2.7)_
7/54

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

E8200

Table des Matières