Tecnodom NERONE EKO Notice D'utilisation page 30

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 40
6 MAINTENANCE
All maintenance operations, repairs and cleaning, must be carried out with the unit in stop position and with
the power switched off.
These maintenance operations must only be carried out by specialised qualified staff.
When parts are being replaced and when removal of the plug is foreseen, and removal of the plug is
clearly indicated, it must be such that an operator may check, from any point to which he has access,
that the plug remains disconnected.
ATTENTION
All of these operations must be done by a qualified technician!
Always wait that the oven cools down paying attention not to touch the heating elements inside it; carry
out the replacement afterwards.
Attention! During maintenance operations, it is high recommended to use working gloves.
6.1 PERIODICAL CHECKS
At regular intervals (at least once a year), it is important to make a complete system check by qualified techni-
cian, as follow:
the state of maintenance of the electrical, installation is fully safe.
the door closes properly and the gaskets are not squeezed
proper operation of the fans
operation of the lamp
periodically check the integrity of the oven door gasket.
6.2 DOOR GASKET REMOVAL AND REPLACEMENT
All oven models are equipped with a gasket, easily extractable for clearing or replacement.
Periodically check the integrity of the oven door gasket.
For an accurate clearing of the oven, the gasket is interlocking, therefore easily removable as follows:
1) Dismount the door as indicated in paragraph 6.3.
2) Pull lightly externally a corner of the gasket and remove it from its housing.
Replace the gasket and mount the oven door by carrying out inversely the procedure described in paragraph 6.3.
ATTENTION
1
NERONE
| User and Maintenance Manual | EN
2

Publicité

Table des Matières
loading

Table des Matières