Operation; Operating Elements En; After First Commissioning And After Long Standstill En - Abicor Binzel iROB Cool Mode D'emploi

Masquer les pouces Voir aussi pour iROB Cool:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

7 Operation

NOTICE
• The coolant pump runs for a preset time to fill the cable assembly. Repeat this procedure if necessary.
4 Disconnect the coolant return hose (2) from the coolant recirculator (3) and hold it over a collecting
device.
5 Close the opening at the coolant return hose (2) and open it again by repeatedly and abruptly releasing it.
NOTICE
• Repeat this procedure until the coolant is drained continuously and without air entrapment.
• Check the minimum coolant level of the coolant recirculator.
• Check the clutches and nozzles for tightness to avoid the leakage of coolant!
6 Switch off the robot welding power source.
7 Reconnect the coolant return hose (2).
8 Check the coolant filling level.
7 Operation
NOTICE
• The coolant recirculator may only be operated by qualified personnel (in Germany see TRBS 1203).
• Observe the operating instructions of the welding components, such as the iROB Pulse robot
The coolant recirculator may only be used in connection with the iROB Pulse robot welding power source.
7.1 Operating elements
1
Fig. 8
7.2 After first commissioning and after long standstill
1 Check the coolant connections for tightness.
2 In case of leakages, tighten the hose clip at leak points using pliers or retighten screw-type clamps using
a screwdriver.
EN - 16
welding power source and welding torch.
1
Display for temperature indication of the coolant
Operating elements
2
2
"Filling" trigger
BAL.0332.0 • 2017-08-31
iROB Cool

Publicité

Table des Matières
loading

Table des Matières