been completed.
4.6 Test run lifting plant
Requirements:
The control is connected to the power supply.
Perform the trial run at least twice during launch.
Avoid dry running during the trial run.
WARNING
Start automatic mode:
AUTO
Press
both
shines:
buttons to start automatic operation of pump 1 and 2.
LipuSmart-P
Operation
105