4 Operation
4.1 Launch
basin.
Switch on HP pump.
Clean the grease separator and lifting plant.
All extension stages: Via the inlet line or a maintenance opening.
■
■
■
The water level rises automatically up to the lowered level of the container.
Close maintenance openings.
1
LipuSmart-P
Operation
Chap. 1.5
Aus/Ein
chap. 4.3.1
chap. 4.5.6
85