Télécharger Imprimer la page

Stanley SPT-163-560 Traduction De La Notice Originale page 26

Masquer les pouces Voir aussi pour SPT-163-560:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 83
G
B
When reassembling the friction wheel
assembly, make sure that rubber ring is
centered and seated properly between the
side plates. Tighten each screw only one rotation
before turning the wheel clockwise and
proceeding with the next screw on the other side
of the wheel. Repeat this process several times to
ensure the plates are secured with equal force
between 90N.m(6 ft-lbs) and 130N.m(9 ft-lbs).
4. Slide the friction wheel assembly back
onto the hex shaft. Make sure the shift
lever pin is in place in the bearing housing.
Follow the steps above in reverse order to
reassemble components.
Charging Battery (if so equipped)
Follow the instructions below to charge
battery:
1. Remove battery cover.
2. Disconnect negative (black) battery cable
first, then positive (red) battery cable.
3. Take battery out of the tray and place it on
bench or other well-ventilated place.
4. Connect positive (+) lead of charger to
positive (+) terminal, and negative (-) lead
to negative (-) terminal.
5. Charge the battery at two and a half amps
for ten hours.
6. Reinstall battery into unit.
9 . Transport
To travel from one work area to another:
Always shut off engine, remove key, and
close fuel shut-off valve when transporting
unit on a truck or trailer. Do not transport
machine while engine is running.
Use extra care when loading or unloading unit
onto trailer or truck.
Secure unit chassis to transport vehicle. Never
secure from rods or linkages that could be
damaged.
10. ENVIRONMENTAL
Recycle unwanted materials instead
of disposing of them as waste. All
tools, hoses and packaging should
be resorted, taken to the local
recycling center and disposed off in
an environment-friendly safe way.
26

Publicité

loading