Sequence Description - Festo 8062644 Brève Description

Station emballage
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

10 Sequence description

Start-up prerequisites
No workpiece on the conveyor
Magazine filled with boxes
Initial position
Conveyor module
— Conveyor motor off
— Stopper advanced
2-axis handling module
— Z-axis at top
— Mid-position cylinder retracted
— Gripper closed
— X-axis homed and in initial position
Packaging module
— Clamping cylinder advanced
— Feed cylinder retracted
— Setup cylinder retracted
— Folding mechanism in initial position
— Stop cylinder retracted
Sequence
1. When the start key is pressed and a workpiece is placed onto the beginning of the conveyor, the
conveyor belt is started in order to advance the workpiece to the stopper.
2. After the workpiece has reached the stopper, a box is prepared for loading.
3. When the box is ready, the workpiece is gripped by the 2-axis handling module and transported to the
packaging module.
4. After the box has been loaded, it's closed and returned to the conveyor module.
5. The conveyor module transports the box to the end of the conveyor belt or to a downstream station.
© Festo Didactic 8062973
Packaging station
63

Publicité

Table des Matières
loading

Table des Matières