11 Commissioning
MPS
®
stations are generally shipped:
•
Fully assembled
•
Individually adjusted and ready for use
•
Pre-commissioned
•
Tested
Note
When stations are combined, the mechanical setup, as well as sensor positions and settings, may
have to be changed.
Commissioning is normally limited to visual inspection in order to ensure correct tubing connections, wiring
and operating voltage supply.
All components, tubing connections and cabling are clearly identified, so that all of the connections can be
readily restored.
11.1 Workstation
You'll require the following in order to commission the MPS
•
The assembled and adjusted MPS
•
A control console
•
A PLC board with a 24V DC, 4A power supply and 16 digital inputs and outputs
•
A power supply unit: A 24V DC. 4 A
•
Compressed air supply: 600 kPa (6 bar)
•
A PC with installed PLC programming software
•
A browser (IE10 or higher, recommended: Firefox from Version 56 onward)
•
Ethernet switch with at least four ports
•
Two Ethernet cables RJ45
•
Two I/O cables (SysLink)