Installation Instructions - Cequent Performance Products TOUGH & TRUSTED BULLDOG DCH Serie Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

BEFORE InSTALLIng AnD uSIng yOuR POwERED HOIST, READ AnD
FOLLOw ALL MOunTIng InSTRuCTIOnS AnD SAFETy MESSAgES.
Mounting
WARNING
To prevent accidental activation of the hoist and serious injury, complete the hoist installation
and attach the hook before installing the wiring.
1. Before Installation
1.1 Inspect Parts
Instruction/Owners Manual
Hoist Assembly
Contactor Control Box
Pendant Remote Control
Mounting Hardware Requirements
Four (4) Hoist Mounting Bolts, Nuts, and Washers are required. Refer to Table 4 below for bolt sizes
and required torque. Mounting system will dictate bolt length.
WARNING
ALWAYS torque mounting bolts to the values specified for your hoist in Table 4 to prevent vibration
during operation.
ALWAYS use class 8.8 metric (grade 5) or better hardware.
NEVER weld mounting bolts.
ALWAYS choose the proper bolt length for your application.
ALWAYS confirm required bolt length to ensure proper thread engagement.
Powered Hoists
Hoist Mounting Bolt
Size
Hoist Mounting Bolt
Torque
CEQUENT

Installation Instructions

Table 4 - Mounting Torque Requirements
DCH650
M8 x
1.5 pitch
8.8 grade
4 Required
40 ft.-lbs.
PERFORMANCE PRODUCTS, INC. •
Pendant Remote Control Socket
Mouting Hardware
Hose Clamps
DCH800
M8 x
1.5 pitch
8.8 grade
4 Required
40 ft.-lbs.
F3839-00 REV C (4782) 08/15
DCH1200
M10 x
1.5 pitch
8.8 grade
4 Required
40 ft.-lbs.
7

Publicité

Table des Matières
loading

Table des Matières