1.2 Select Mount Location
WARNING
ALWAYS choose a mounting location that is sufficiently strong to withstand the maximum
pulling capacity of your hoist.
1.2.1 Hoist Mounting Considerations
1. Your mounting surface must be equal to or greater than the footprint of the hoist frame.
2. Make sure the motor, drum and gearbox housing are aligned correctly.
3. Mounting template included with each hoist.
8
CEQUENT
Installation Instructions
Figure 2 - Dimensions
PERFORMANCE PRODUCTS, INC. •
™
DCH650
DCH800
DCH1200
F3839-00 REV C (4782) 08/15