Hydronic Switching Operations - oventrop OKP 10 Instructions D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.3 Hydronic switching operations

The collector housings of the OKP collectors can be
mounted in series side by side with a distance of 135
mm – 145 mm (see illustr. 26). When installing several
collectors, twelve OKP 10 or six OKP 20 (see illustr. 31)
with a total of 120 tubes can be connected in series.
Installations with more than 120 tubes have to be con-
Installation of PT1000
RL
VL
RL
VL
Series connection of a maximum of 120 tubes per riser.
Parallel installation of two risers.
Recommended hydronic switching operation, left hand side connection.
RL
VL
RL = Return, VL = Supply
Illustr. 31: Recommended hydronic switching operation of OKP collectors, left hand side connection.
Installation of PT1000
U-bend
136 1295
Illustr. 32: Hydronic switching operations of OKP collectors, right hand side connection.
For an overview of our global presence visit
www.oventrop.com.
Subject to technical modification without notice.
136123080
07/2013
16
Coupling
136 1622
Coupling
136 1622
nected according to the Tichelmann system - the solar
circuit is divided into several risers with 120 tubes each.
As each individual riser has the same pipework resist-
ance, identical flow rates are achieved. The temperature
sensor must always be installed in the hot supply (VL) on
the left hand side of the collector OKP 10 and OKP 20
(see illustr. 28).
U-bend
136 1295
VL
RL
VL
RL
VL
RL

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Okp 20136 12 30136 12 31

Table des Matières