Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 33
i
Please follow these instructions carefully, and in about 10 minutes, your pull bar is
assembled and ready for assembly.
Prior to installation, please check of which material your desired
installation location is made and whether it is resilient.
Ceiling mounting must only be carried out where either load-bearing beams are in the ceiling, or
if your ceiling is made of gas concrete or limestone. The height for the installation of the device is
given obviously.
When it comes to selecting suitable wall plugs, we use
very load-bearing heavy-duty anchors which ensure a
high degree of safety.
Installation of the device:
Step 1
Mount the frame connection to the main frame with M10X55 bolts and nuts. Tighten
the screws using the tools provided.

3. ASSEMBLY INSTRUCTIONS

18

Publicité

Table des Matières
loading

Table des Matières