SPORTSTECH KS400 Mode D'emploi page 19

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 33
Mounting on the ceiling
The pull bar is attached to the wall at the brackets provided for this purpose.
Attention! An incorrectly loaded heavy load anchor can only be ext-
Step 1
For a drilling of the two main frames, two markings on the wall are now marked with
the help of the water scale. Drilling of the holes is done with a percussive drill and a
10 mm and 12 mm hard metal drill / rock drill.
Begin the drilling of the first two holes with 10 mm carbide drill at low speed and low
Step 2
pressure. Then drill the two holes with a 12 mm carbide drill. Take into account that
dust is generated. If a second person is nearby, they could hold a vacuum cleaner to
the well to absorb the dust.
Step 3
After completion of the first two holes, a control check is carried out using the spirit
level. If they fit exactly, the remaining plug holes are now marked and carefully drilled
as well.
Step 4
The heavy-duty anchors are hammered into the hole without damaging their threads.
All plug holes must be drilled a little bit deeper than is the length of the heavy-duty
anchors. These holes must be vacuumed with the vacuum cleaner before driving in
the anchors.
Step 5
La barra de la barbilla y se monta en el techo para los montajes previstos. The pull
bar is attached to the ceiling by means of the brackets provided for this purpose. The
nuts of the heavy-duty anchors are now tightened with a corresponding spanner or
ring wrench.
Optional
Thanks to the metal rings provided for this purpose, you can also attach other de-
vices, for instance a punching bag, pull ropes etc. This gives you many other possible
exercises which you can perform with this device.
racted with great effort.
19
EN

Publicité

Table des Matières
loading

Table des Matières