ASSEMBLY INSTRUCTIONS
Remove all the separate parts from the packaging, lay them on the
floor and check roughly that all are there on the base of the assem-
bly steps. Please note that a number of parts have been connected
directly to the main frame and preassembled. This will make it easier
and quicker for you to assemble the equipment. Assembly time: 30
- 40 min.
STEP 1:
Attach the stabilizer (1+2) at the supports (3+4).
1. Put the front stabilizer (1) at front support tube (3) so that the ho-
les align. Put onto the screws M8x20 (15) one washer 8//16 (18) and
screw the front stabilizer (1) at front support tube (3) tightly.
2. Put the rear stabilizer (2) at rear support tube (4) so that the holes
align. Put on the screws (15) one washer (18) and screw the rear stabi-
lizer (2) at rear support tube (4) tightly.
3. Put the rear support tube (4) into holder at front support tube
(3) so that the holes align. Put on the screw M10x70 (13) one was-
her 10//20 (17) and connect the rear support tube (4) at front support
tube (3) by using further washers (17) and nylon nut M10 (20). (Atten-
tion: Don't tighten too much this connection point so that the fold up
function is without clamp effect.)
4. Place the locking pin (22) through the holes and lock up this posi-
tion. For using the fold up function pull out the locking pin (22).
STEP 2:
Attach the leg pad support (5) at front support tube (3).
1. Place the leg pad support (5) at front support tube (3) so that the
holes align. Put onto the screws M10x70 (13) one washer 10//20 (17)
and screw the leg pad support (5) at front support tube (3) tightly by
using further washers (17), reinforcement plate (10) and nylon nuts
M10 (20).
2. Push the foam pad holder (9) into desired position at leg pad sup-
port (5) in the middle and push on both ends of foam pad holder (9)
one leg foam pad (11).
STEP 3:
Attach the cushion (12) and hand grips (7+8).
1. Place the cushion (12) onto cushion holder (6), so that the holes of
cushion holder (6) and thread of cushion (12) are align.
2. Put onto the screws M6x20 (16) one washer 6//12 (19) and screw
the cushion (12) at cushion holder (6) tightly.
3. Put onto the screws M10x60 (14) one washer 10//20 (17) and put
the screws (14) through the holes at right hand grip (8). Put the right
hand grip (8) with the screws through the holes at cushion holder (6)
and put on opposite side the left hand grip (7) and further washers (17)
and nylon nuts M10 (20) to tighten this screw connection.
22
20
17
3
15
18
18 15
18
15
1
11
9
13
17
13
17
5
12
17
14
8
17
14
11
15
18
4
17
15
15
13
18
18
3
11
17
20
10
17 20
7
19
17 20
16
6
GB
31
31
2
31
31
31
31
32