Performing Tests - Sentiotec DC9 Instructions De Montage Et Mode D'emploi

Commande de sauna
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation instructions, only for experts
Fig. 2

4.4. Performing tests

The following tests must be performed by a certified electrical fitter.
WARNING!
The following tests must be performed with the power supply
switched on. There is a danger of electric shock.
● NEVER touch live parts.
1. Check the contact of the earth conductors on the earth conductor terminal.
2. Check the safety shut-off.
a. Switch on the control unit.
► The control light must be permanently on.
If the control light flashes, continue from point 5. Troubleshooting for
the installer.
WORLD OF WELLNESS
Heater sensor half-shells
1
Connection panel
2
Cross-head screws (9 mm)
3
4
Heater sensor
Heater sensor wires
5
Wood screws (16 mm)
6
p. 11/18
EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

D-fc-9

Table des Matières