Start Up Form / Fiche De Demarrage - Airwell ROOFTAIR RT30 Manuel D'installation Et De Maintenance

Table des Matières

Publicité

APPENDIX / ANNEXE / ANLAGE / ALLEGATO / ANEXO
This Appliance has been handed-over
Site:
by (Name of Technician):
Date:
ALL OpERATIONS, SAFETY MAINTENANCE AND RECOMMANDATIONS HAVE BEEN ExpLAINED TO THE USER
SIzE RTL/RTCL
SIzE RTH/RTCH
a =
a =
a =
Installation
d=
m
d=
m
b=
Unit installation
Floor
Comp 1
Rotation sens
Outdoor fan (OFAN)
Rotation sens
L1-L2
power supply
L1-N
Motor fixation
Blower fixation
Pulley alignment
Pulley fixation
Belt tensionning
Safety device check Circuit 1
Low pressure Switch (LP)
High pressure Switch (HP)
OFAN
Ph1
Absorbed current (A)

START Up FORM / FICHE DE DEMARRAGE

Signature
please, return one Copy of this Form to our ASTS department
THIS DOCUMENT IS MANDATORY TO START UNIT WARRANTY
Unit S/N
Comp 1 S/N
Comp 2 S/N
Comp 3 S/N
Comp 4 S/N
m
m
m
c=
m
m
Roof
Comp 2
Comp 3
Main blower (IFAN)
V L1-L3
V L2-L3
IFAN - Indoor blower
OK
NON
Motor pulley type (reference)
Blower pulley type (reference)
Belt reference
Int on motor plate / Overload setting
Current (Ph1/Ph2/Ph3)
Measured airflow
OK
Value
1
2
Ph2
Ph3
Ph1
Ph2
Ph3
XXXIX
User:
Company:
Air filter
Dirty filter switch
Air flow switch
Economiser
Electric heat
hot water coil
All season kits
Smoke detector
Comp1 oil level
Comp2 oil level
Comp3 oil level
Comp4 oil level
Roofcurb
Comp 4
Exhaust blower
V
PC Board IATC
V
Safety device check Circuit 2
3
4
Ph1
Ph2
Ph3
Ph1
Ph2
Options
Yes
No
R407C
R410
Software version
V
OK
Value
Ph3

Publicité

Table des Matières
loading

Table des Matières