WERTHER INTERNATIONAL TITANIUM 100/22 Notice D'instructions page 16

Table des Matières

Publicité

12
3.2 POSITIONING AND PARTS ASSEMBLY
3.2.1 Arm assembly
· Unscrew the pallet fixing screws and set the tire changer on the floor.
· Unscrew the 4 screws from the body, set the vertical arm into the pro-
per seat and fix the screw again (Fig. 5/a).
· Make sure the horizontal arm is on the vertical arm's support and the
pin is locked with nuts and washers as shown in Fig. 5/b.
Before connecting all the power sources
ALWAYS check your installations. They
must exactly correspond to those reque-
sted by the machine.
· Connect the machine to the compressed air network (Fig. 5/d)
· Mount the bead breaker arm as shown in Fig. 5/e:
-Set the arm "a" into the proper seat, set the screw into the hole and
screw the nut WITHOUT TIGHTENING.
- Set the pivot pin "b" into the hole on the arm and let the cylinder's
shaft pass through the pin's hole. Screw two nuts WITHOUT
TIGHTENING.
-Set the spring by hooking it at the indicated points.
· Screw the bead breaker arm's screw as indicated in Fig 5/f
· Screw the nut as indicated in Fig 5/g

Publicité

Table des Matières
loading

Produits Connexes pour WERTHER INTERNATIONAL TITANIUM 100/22

Table des Matières