Electronics Unit; First Commissioning; Leds - POOL squad Ampero Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2. ELECTRONICS UNIT

2.1. First commissioning

BEFORE FIRST START UP, carefully read the manual supplied with the amperometric probe. This manual
contains instructions that are essential for successful start up and optimal operation of the equipment. It is
imperative and rigorous to follow and comply with all of this manual.
When first connecting the electronics unit to a power supply :
1) Carry out the programming below.
Successive
menus
2) The successive messages below are displayed.
3) Some successive safety mechanisms are displayed.

2.2. LEDs

Colour
Green
Red
Possible settings
Français
English
Deutsch
Español
Italiano
Nederlander
Portugués
From 10 to 200 m
3
, in increments of 10 m
Day / Month / Year
Hour / Minute
In line
Dashboard
From 0.1 to 8 g/L, in increments of 0.1 g/L
Status
Continuously on
Continuously on
Flashing
I
For each menu, select a setting with the
buttons, then confirm with the OK button.
3
Production in progress
Electronics unit powered off
Wintering mode on
Alert activated
Alarm activated
Navigation
Possible meanings
4

Publicité

Chapitres

Table des Matières
loading

Table des Matières