1.
2.
3.
3.1
SAFTY MARKING
3.2
3.3
3.4
4.
5.
6.
7.
8.
9.
10.
10.1
TURNING ON THE AUTOCLAVE AND BAROMETRIC ALIGNMENT
10.2
CLEAN WATER TANK MANUAL LOAD
10.3
10.4
10.5
10.6
END OF THE STERILISATION CYCLE
10.7
10.8
10.9
11.
11.1
CYCLES DESCRIPTION
11.2
11.3
READING OF THE CYCLE REPORT
12.
13.
AUTOCLAVE CHECK TEST
13.1
13.2
BIOLOGICAL INTEGRATORS
13.3
13.4
13.5
14.
OSMOSI SYSTEM INSTALLATION
15.
15.1
TECHNICAL AUTHORIZED ORDINARY MAINTENANCE
16.
ALARM MESSAGES
INDEX
ENGLISH
1