Télécharger Imprimer la page

Installation; Single Sided Indoor (Sf) Clock; Outdoor Clock Or Single Sided Abattoir (Sf); Mounting On Support Double-Sided (Df) (Indoor) - Bodet Horloge Profil 930 Manuel D'installation

Publicité

Les langues disponibles

Les langues disponibles

II - Installation
Choose a location where to install the clock, preferably away from sources of electrical interference,
such as transformers. The data network must be PoE (802.3af, class 3).

2.1 Single sided indoor (SF) clock

Clocks for indoor use are simply mounted by hanging on a screw head (see dimensions page 23).
1) Position a screw (Ø 4) at the required height, leaving the head protruding by 3mm.
2) Connect the clock to the data network (photo 1). See next page about the connection of this cable.
3) Put the clock in its position.

2.2 Outdoor clock or single sided abattoir (SF)

1) Remove the wall bracket (1) of the clock, by giving a quarter turn in the
anticlockwise.
2) Run the cables through the hole (2) and fit the wall bracket (1) using 2 screws Ø6.
3) If necessary, carry out the various connections (external supply see page and
connection to a time distribution network: see page ).
4) Present the clock on the wall bracket (1), then turns it a quarter turn in the
clockwise so that the clock is in the correct position.

2.3 Mounting on support double-sided (DF) (indoor)

1) Fix the double-sided support to the wall or ceiling, using 2 Ø6 screws (see dimensions page 23).
2) Connect the clock which will be the master of the double sided assembly to network
with Ethernet cable RJ45 (photo 1). See next page about the connection of this cable.
This cable provides network communication and power to the clocks (PoE: Power over Ethernet).
3) Connect RJ12 cable on the master clock.
4) Connect to the second clock (slave), the master clock by the RJ12 cable only (photo 2).
Do not use a standard telephone cable RJ11.
Do not connect an Ethernet PoE cable to the RJ45 of the slave clock
5) Present the clocks to the support, then turn them clockwise to their final positions.
6) Wall bracket option: fit the disk on the back of the clock and turn it clockwise in order to lock it on
the clock? The passageway for the cables must be at the bottom of the disk
EN
208
High
Down
1
2
19

Publicité

Chapitres

loading

Ce manuel est également adapté pour:

Horloge profil 940Profil 930Profil 940