9
Check lists
9.1
Check list for door system
Confirm features at start-up with a check mark.
No.
Equipment
1.0
Garage door
1.1
Manual opening and closing
1.2
Fastenings / connections
1.3
Pivots / joints
1.4
Track rollers / track roller holders
1.5
Seals / sliding contact strips
1.6
Door frame / door guide
1.7
Door leaf
2.0
Weight
2.1
Springs
2.1.1 Spring strips
2.1.2 Spring break device
2.1.3 Safety elements (spring
connector,...)
2.2
Wire cables
2.2.1 Mounting
2.2.2 Cable drum
2.3
Fall protection
2.4
Concentricity of T-shaft
3.0
Drive / control
3.1
Drive / rail / bracket
3.2
Electrical cables / connections
3.3
Emergency release
3.4
Control devices, push
buttons / hand transmitters
3.5
Limit stop
4.0
Safeguarding of crush and shearing zones
4.1
Force limit
4.2
Protection against lifting of
persons
4.3
Site conditions
Present?
Features to be tested
Smooth running
State / seat
State / lubrication
State / lubrication
State / seat
Alignment / fastening
Alignment / state
State / seat / setting
State
State / rating plate
State / seat
State / seat
State / seat
State
State
Function / state
Function / state
State / position
Stops and reverses
Door leaf stops at 20 kg
Safely distances
Note
EN - 73