mspa TUSCANY Manuel Du Propriétaire page 12

Masquer les pouces Voir aussi pour TUSCANY:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Humidity is a naturally side effect of indoor spa installation. The room shall be properly ventilated to allow
moisture to escape. Install a ventilating system to prevent excess condensation moisture in the room.
Additional requirements for outdoor installation
weight of the filled spa and maximum occupants.
damage the spa floor.
water inside the circulation system, the pump, and the pipes is frozen. Put a Heat Preservation Mat in
between the spa bottom and the ground to prevent heat loss from the bottom of the spa and to provide
better heat retention.
PRCD Testing
1. Plug the machine into the mains.
2. Press the RESET
3. Press the TEST
4. Press the RESET
1.
Spa Control Unit Connected to External Equipotential Bonding Conductors
1.5mm² solid copper conductor.
work on faulty
sockets or
plug boards.
.
!
WARNING
2.
RESET
RESET
TEST
Indicator
12
3.
RESET
TEST
TEST

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

P-tu049P-tu069

Table des Matières