Installation
Supplies recommended for installation
• Lockable shut-off on the outlet if tempered water is supplied to one or more emergency fixtures
• Lockable shut-off on the inlets/supplies
• (6) 3/8" wall anchors and fasteners for surface-mounted cabinet
• (4) 1/4" fasteners (and wall anchors, if necessary) for recess-mounted cabinet
• Unions on all connections to facilitate removal of valve
Tools required for temperature adjustment
• 5/32" Allen wrench
• Blade screwdriver
1
Install Optional Cabinet (If not installing cabinet, skip to Step 2)
Recessed Cabinet:
1. Rough-in wall opening 24-1/2" W x 28-1/2".
2. Insert the cabinet and secure to wall with four 1/4"
fasteners properly anchored (supplied by installer.)
3. Install two anchors and screws through the valve bracket
in back of the cabinet into a secure brace (supplied by
installer) or into wall. This will support the valve.
4. Install the valve nipples and one-half of the union ball
valve using pipe sealant or teflon tape. Install the other
half of the union ball valve onto inlet and outlet pipe.
5. Insert the valve into the bracket in the cabinet (right
side goes in first). Continue with the valve installation
procedure.
6. Position the wall flange tight to the wall and caulk in
place.
Bradley • 215-1818 Rev. B; ECN 17-09-009
Surface-Mounted Cabinet:
1. Measure and mark the cabinet mounting hole
locations at the dimensions shown on next
page. Install six 3/8" wall anchors (supplied by
installer).
2. Position the cabinet onto the wall and secure
into place with six 3/8" wall fasteners (supplied
by installer).
3. Install the valve nipples and one-half of the
union ball valve using pipe sealant or teflon
tape. Then install the other half of the union ball
valve onto the inlet and outlet piping.
4. Insert the valve into the bracket in the cabinet
(right side of the valve goes in first). Continue
with the valve installation procedure.
12/7/2017
EFX 120/S19-2350
3