Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
Installation

Supplies Required:

• Pipe sealant
• Piping to 1/2" NPT water supply inlet on unit
• Sign-mounting hardware
NOTE: Local codes may require the installation of a backfl ow prevention valve to complete proper installation. Compliance
with local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly.
Backfl ow prevention valves are not included with the fi xture and may be supplied by the contractor or purchased from
Bradley Corporation.
Step 1: Attach eyewash
NOTE: The top of the eyewash heads should be positioned a maximum of 45" from the floor.
1. Select the desired location for the eyewash on the sink deck and drill a 7/8" diameter hole.
2. Secure the assembled unit to the deck with the nuts and washers provided as shown on page 4.
Step 2: Connect water supply
1. Connect the water supply using 1/4" nominal (3/8" O.D.) copper tubing (supplied by installer), the friction ring, seal
washer and nut provided.
2. Mount the safety sign to wall or pipe using sign-mounting hardware supplied by installer.
3. Open the water supply lines. Test for leaks and adequate water flow.
Bradley Corporation • 215-634 Rev. T; ECN 08-507
5/8/08
S19-270B
3

Publicité

Table des Matières
loading

Table des Matières