Important; Supplies Required - Bradley S19294JB Installation

Douche oculaire/faciale rabattable sans barrière, dissimulée dans armoire avecc pièce de raccordement. douche oculaire/faciale rabattable sans barrière, dissimulée dans armoire avec siphon en p.
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

S19294JB, S19294JBT
Read this installation manual completely to ensure proper installation, then file it
Installation
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
Packing List
discarding any packaging material. If any parts are missing, do not begin installation
T H
IS
E
S ID
U P
until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to the
eyewash should be "ON" at all times. Provisions shall be made to prevent unauthorized
shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley
plumbed emergency fixtures require a minimum 30 PSI (0.21 MPa) flowing pressure.
Flushing fluid should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance
with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per ANSI
Z358.1.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
For questions regarding the operation/installation of this product, visit bradleycorp.com
or call 800.BRADLEY (800.272.3539).
Product warranties may also be found under "Products" at bradleycorp.com.

Supplies Required:

Piping to ½" NPT water supply inlet on unit
Bolts for cabinet mounting
Pipe sealant
Sign-mounting hardware
Local codes may require the installation of a backflow prevention valve to complete proper installation. Compliance with
local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly.
Backflow prevention valves are not included with the fixture and may be supplied by the contractor or purchased from
Bradley Corporation.
2

IMPORTANT

3/28/2013
Bradley • 215-1745 Rev. B; ECN 13-05-014
Installation

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

S19294jbt

Table des Matières