Supplies Required; Secure Base To Floor; Assemble Components; Connect Water Supply - Bradley S19-310AC Manuel D'installation

Masquer les pouces Voir aussi pour S19-310AC:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

Supplies Required

• (3) 3/8" floor anchors and bolts
• Teflon tape and pipe sealant
• Piping to 1-1/4" NPT water supply inlet and 1-1/4" NPT
drain outlet on unit
• Adequate supply pipe supports
• Minimum 4" (102mm) drain to accommodate 30 gallons
(115 liters) per minute discharge for shower waste
• OPTIONAL: sign-mounting hardware
Local codes may require the installation of a backflow
prevention valve to complete proper installation.
Compliance with local codes is the responsibility of the
installer. Valve must be tested annually to verify that it
is functioning properly. Backflow prevention valves are
not included with the fixture and may be supplied by the
contractor or purchased from Bradley Corporation.

Secure base to floor

1. Install three suitable anchors (supplied by installer)
for 3/8" bolts in the floor.
2. Bolt the base to the floor anchors using 3/8" bolts
(supplied by installer).

Assemble components

1. Assemble the remaining unit components as shown
on page 4.
2. Apply pipe sealant (by installer) to all male-threaded
pipe joints.
3. Use the rubber grip pad provided or a strap wrench
around pipes when tightening to prevent marring.
Place the grip pad on the pipe, then put the wrench
over the grip pad and turn the pipe with the wrench.
4. When connecting the steel chain, first connect the
chain to the "S" hook on the foot treadle. Then, with
the foot treadle raised up, straighten the chain and
connect a link to the "S" hook on the valve handle.
Make sure the chain is pulled tight. The length of
chain will vary.

Connect water supply

Bottom edge of the showerhead should be 86"
(2184mm) from floor.
NOTICE! Do not rely on Bradley's Combination Unit
to support supply piping.
1. Connect water supply piping to 1¼" NPT inlet on unit
(piping by installer). Provide adequate supports (by installer)
for supply pipe using pipe hangers or other means.
2. Connect drain piping to 1¼" NPT drain outlet on unit (piping
by installer).
3. Hang the safety sign from the unit with the curtain hooks
provided (or mount it to the wall using sign-mounting
hardware by installer).
Bradley • 215-163AC Rev. C; ECN 17-05-039
25¼"
(641mm)
4½"
(114mm)
25-1/2"
Ø 3¹⁄₁₀"
(648mm)
(79mm)
86"
(2184mm)
to Floor
Top View From Bowl
Ø 10¾"
(273mm)
10½"
(267mm)
All dimensions assume standard thread
engagement. Variations in manufacturing
allow for +/- ¹⁄₈" (3mm) per threaded joint.
To find the tolerance of a dimension, add
the number of thread joints in between a
dimension and multiply it by ¹⁄₈" (3mm).
7/18/2017
S19-310AC
65¾"
(1670mm)
to Floor
36¹⁄₈"
(918mm)
to Floor
6"
(152mm)
9½"
(241mm)
Ø 9" (229mm)
Flange with (3)
Ø ³⁄₈" (10mm)
Holes on Ø 8"
(203mm) Bolt
Circle
3

Publicité

Table des Matières
loading

Table des Matières