Ignition And Operation - LA NORDICA LNK15 Manuel Utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

IgNITIoN AND opErATIoN

Before starting the boiler, you must make sure that the system has been filled with water and has been bled properly. For high quality and
safe operation, the wood heating generators must be managed by complying with the instructions in this manual. Adults only can carry out
the task of operator.
IMPORTANT - The amount of fuel must be limited when using combustion for the first time. It is permitted to pile a maximum
amount of wood up to the upper edge of the ignition door. After first combustion, you must comply with the 6-hour downtime.
Condensation can develop on first ignition and leak out - this is not a defect.
This phenomenon disappears the next time the boiler is used.
prEpArE THE fUEL
Prepare logs of wood 50 cm long and having different thicknesses.
Logs that are longer or round pieces of wood must be cut first!
fuel loading.
Open the loading and ignition door
1.
Distribute a layer of cardboard or pieces of paper on the entire bed of the ceramic base of the
upper combustion chamber
(attention: the nozzle openings must always be free!)
2.
Pile a layer of ignition wood onto the cardboard or pieces of paper
3.
Distribute a layer of cardboard or pieces of paper on the entire surface of ignition wood
4.
Pile ignition wood until the entire ignition door is covered
5.
Pile larger pieces of wood 50 cm long lengthwise into the boiler (larger logs must stay on top), limiting the air space between one log and
another.
ENgLIsH
53

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Lnk20Lnk30Lnk40

Table des Matières