Closed Vessel Installation - LA NORDICA LNK15 Manuel Utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CLosED vEssEL INsTALLATIoN.

The diagrams are purely indicative, therefore they do not have design value.
Installation, relative system connections, commissioning and verification of correct operation must be carried out correctly by professionally
qualified and trained personnel in full compliance with current national, regional, provincial and municipality regulations in the country
where the appliance is installed.
Size the system correctly to avoid long pause times that would cause significant problems like the ones mentioned in the section regarding
DOWN-FIRED BOILER OPERATION.
ATTENTIoN : the boiler's circulator operates based on the differential temperature between the boiler and the puffer. if the
boiler's temperature drops below the temperature of the puffer, the circulator stops.
2
VST
95 °C
VSP
6
1
7
1
LNK down-fired boiler
2
Automatic DSA Thermal Discharge Valve
3
Safety valve 2,5 bar
4
Thermometer
5
Pressure gauge
6
Expansion tank
7
Circulator
8
Anti-condensation mixing valve for 60°C recirculation circuit
9
Balancing valve
10
Puffer
11
Solar panels
12
Domestic hot water production
13
Auxiliary boiler (gas, methane, LPG or Diesel)
14
Radiator system (high temperature)
15
Radiant panel system (low temperature)
16 (*)
Puffer probe
(*) IMporTANT: The buffer tank probe position is illustrative. The real position has to be evaluated with the installer/designer.
11
3
4
5
T
M
9
8
CA
TS
VMS
12
16
10
(can be supplied as an OPTIONAL accessory)
ENgLIsH
15
13
14
R
6
VE
VM
51

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Lnk20Lnk30Lnk40

Table des Matières