Connecting The Display Cable - Seca 645 Mode D'emploi Et Garantie

Masquer les pouces Voir aussi pour 645:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 117
Connecting the display
86 •
ATTENTION!
cable
Malfunction due to installation errors
If cables are strained during fitting, e. g. with
sharp bends or kinked connectors, this may
result in faulty displays and failure of the display.
– Route all cables to prevent sharp bends and
– Provide strain relief by routing all cables in the
1. Lift the scale so that the underside of the weighing
platform is accessible.
NOTE
You can rest the scale on the handrail for this
assembly work.
2. Pass the display cable along under the weighing
platform to the electronics box as shown in the
diagram.
3. Connect the display cable to the electronics box.
4. Push the cable clip attached to the display cable at
the factory into the bore on the scale frame until
you feel it engage.
5. Press the display cable into the cable clips on the
scale frame until you feel them engage.
6. Lower the scale.
kinked connectors.
relevant holders.

Publicité

Table des Matières
loading

Table des Matières