Leveling The Unit - Jacuzzi ERA FREESTANDING Serie Instructions D'installation Et Fonctionnement

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 5
It is strongly recommended that two people perform the following
steps.
X
X
Place the unit over each secured wedge anchor.
X
Y
Once the holes are lined up with the wedge anchors, gently lower
the unit down (Figure 23).
X
Z
Firmly press the unit onto the wedge anchors to finish the
installation.

Leveling the Unit

Use of a level will be needed to verify that the bathtub is level. If the
bathtub is not level, please perform the following steps.
To lower and raise the height of the bathtub (Figure 24):
X
X
Locate the leveling foot (2 total; one under each support block).
X
Y
Adjust the bathtub to the desired height and levelness.
X
Z
Retighten the height adjustment bolts.
X
[
Proceed to the "Plumbing Installation: Double Ended" section.
Once the bath tub has been secured, all finish plumbing must be installed.
Please refer to the installation instructions that are included in the
packaging.
When complete, please proceed to the "Leak Test" section.
Pedestal
It is strongly recommended that two people perform the following
steps.
Step 1
X
X
Attach the four (4) pedestal legs to the bottom of the bathtub
(Figure 25).
X
Y
Fingertighten at this time.
X
Z
When complete place the unit on the packaging, or a blanket, off to
the side of the installation area.
Page 14
Wood Frame
Wedge
Anchor
Figure 23. Wood Frame Placement
www.jacuzzi.com
Era™ Freestanding Bath
Wood Frame
Wedge
Anchor
Down
Up
Figure 24. Level Adjustment
Bathtub
Flat Washer
Nuts
Pedestal
Stand Off
Figure 25. Pedestal Leg Attachment
Installation and Operation

Publicité

Table des Matières
loading

Table des Matières