Suggested Tool Requirements - Friedrich Chill EP08 Manuel D'utilisation Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Suggested Tool Requirements

SCREWDRIVER(+, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL
PREPARATION OF CHASSIS
1. Remove the screws which fasten the cabinet
at both sides and at the back.
2. Slide the unit out from the cabinet by gripping
the base pan handle and pulling forward while
bracing the cabinet.
(Fig .2)
3. Cut the window sash seal to the proper length.
Peel off the backing and attach the Foam-PE to
the underside of the window sash.
4.
Insert the Frame guides into the bottom of the
cabinet.
(Fig .4)
Insert the Frame Curtain into the
5.
and Frame Guides.
(Fig .4)
Fasten the curtains to the unit with 8 Type
6.
A screws.
(Fig .4)
(Fig .1)
(Fig .3)
Upper Guide
Upper guide
Screw
(Type A)
Foam-PE
1
Frame guide
12
Shipping screws
Fig. 1
Fig. 2
Fig. 3
Screw(Type A)
1
Fig. 4
9

Publicité

Table des Matières
loading

Table des Matières