Honeywell MILLER SkyORB Manuel D'utilisation page 20

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Us e r I nst r uct i o n s - E ng l i sh
Install outriggers, large and small struts, and ramps to stabilize base.
Fig. 14a
Fig. 14b
Fig. 14c
Step 8
20
Install outriggers on each side of the cen-
ter base unit.
Remove the two (2) center bolt assemblies
on each side of the center base unit. Align
base, and reinstall bolts with lock washers
Repeat procedure for second outrigger.
Install bolts loosely before proceeding.
Install long struts on each side from the
outriggers to the base column.
installation by removing any pre-attached
fasteners. Then remove the bolt assem-
blies located on the top of each outrigger
on the outer end.
Attach long strut to the designated hole
on the base column with the bolt/nut as-
sembly; insert bolt with lock washer and
Repeat procedure for both long struts.
Install bolts loosely before proceeding.
Attach other end of strut to the designated
hole on the top of the outrigger end using
Repeat procedure for both long struts.
Install bolts loosely before proceeding.

Publicité

Table des Matières
loading

Table des Matières