8 Putting out of operation
8 Putting out of operation
NOTICE
• When decommissioning the system, ensure that the procedures for switching off the
welding components are observed.
1 Wait until the shielding gas post-flow time has passed.
2 Close the shut-off valve for the gas supply.
3 Switch off the power source.
9 Maintenance and cleaning
Despite the above, scheduled maintenance and cleaning are prerequisites for a long service
life and fault-free operation.
DANGER
Risk of injury due to unexpected start
The following instructions must be adhered to during all maintenance, servicing, assembly,
disassembly and repair work:
• Switch off the power source.
• Close off the compressed air supply.
• Close off the gas supply.
• Switch off the entire welding system.
• Disconnect all electrical connections.
DANGER
Electric shock
Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation and damage.
• Replace any damaged, deformed or worn parts.
NOTICE
• The specified maintenance intervals are guidance values and refer to single-shift
operation.
• Only qualified personnel are permitted to perform work on the device or system.
• Check and wear your personal protective equipment.
1 Remove weld spatter.
2 Check that all threaded fittings are tight.
BINZEL offers factory repair services.
EN - 16
®
ABIROB
BAL.0125 • 2019-04-15
A