Cleaning & Maintenance - Apex iCH Prime Instructions D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 87
iCH Prime/English
5. Cleaning & Maintenance
5.1 Device
The device should be checked and dusted regularly (at least every 30 days). Wipe with a damp
cloth and a mild detergent and keep it free from dust. If other detergent is used, choose one that
will have no chemical effects on the surface of the plastic case. All parts should be air-dried
thoroughly before use. Inspect the device and all circuit parts for any damage after cleaning and
replace if necessary.
WARNING: Don't try to open this device. Repairs and internal servicing should only performed by
an authorized service agent. Do not drop any object into the air tube or air outlet.
5.2 Tubing and Mask
The tubing and mask should be checked and cleaned regularly. Please refer to the cleaning
instruction s that come with the accessories.
1. Disconnect the air tubing from the air outlet of the device.
2. Remove the air tubing and headgear straps from the mask.
3. Wash the mask system according to the instructions supplied with it.
4. Wash the air tubing in warm water using mild detergent. Rinse thoroughly, hang and allow to
dry.
5. Before next use, assemble the mask and headgear according to the mask user instructions.
6. All items of the mask and air tubing are subject to normal wear and tear and may eventually
be
replaced. Replace the mask and the air tubing if they are damaged.
CAUTION:
moisturizing or antibacterial soaps to clean the cushion, mask or air tubing. These solutions
may cause hardening and reduce the life of the product.
CAUTION:
(158°F)
WARNING:
Do not use any cleaner containing fragrance or conditioners as they will leave a
residue.
WARNING:
cross-infection.
Do not use bleach, chlorine-, alcohol-, or aromatic-based (including all scented oils),
Do not wash or dry the mask or air tubing at a temperature above 70°C
The mask must not be re-used by another person. This is to avoid the risk of
15

Publicité

Table des Matières
loading

Table des Matières